• Base Plate for Shoring Frame Scaffolding
  • Base Plate for Shoring Frame Scaffolding
  • Base Plate for Shoring Frame Scaffolding
  • Base Plate for Shoring Frame Scaffolding
  • Base Plate for Shoring Frame Scaffolding
  • Base Plate for Shoring Frame Scaffolding

Base Plate for Shoring Frame Scaffolding

Material: Steel
Type: Fixed
Structural Style: Multi-Pole Scaffolding
Framework: Combined Scaffolding
Supporting Mode: Projecting Scaffolding
Lapping Form: Full Scaffolding
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:

Contact Supplier

Diamond Member Since 2016

Suppliers with verified business licenses

Trading Company

Basic Info.

Model NO.
TPCTSFBP002
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Frames
Construction Properties
Installation Scaffold
Item
Shoring Base Plate
Surface Finish
Powder Coated,Electro Galvanized
Tube Size
54X2mm
Color
Silver,Red,etc.
Transport Package
Steel Pallet
Specification
as pre requirements
Trademark
TP Scaffold
Origin
Jiangsu, China
HS Code
73084000
Production Capacity
2000tons Per Year

Product Description


Shoring base plate for frame scaffolding(exterior):
 
1. Shoring base plate for frame scaffolding is designed to fix the shoring screw jack.
2. There are  tubes of different diameters used to weld to plates, which is interior base plate or exterior base plate.
3. Cusotmized sizes can be produced as requested
4. Surface finish: electro galvanized, or powder coated
5. Packing: bags
6. High quality, competitive price and fast delivery
7. Other shoring components, such as heavy duty scaffolding frame, galvanized cross brace, J head, levelling jack are manufactured as well.
 
Type Shoring Frame scaffolding base plate
Material Q235  material with high tensile and yield stress
Color silver, red, etc.
Surface Treatment Electro galvanized,powder coated,etc.
Advantages Top quality, Competitive price, Timely delivery, Good Service, Standard package
Minimum order 1 piece
Supply ability 20 containers/month
Port Nanjing/Shanghai
Currency USD, RMB
Payment L/C, T/T, 30% in advance
Package Bags and Pallet
Delivery according to quantities to be need
Base Plate for Shoring Frame Scaffolding Base Plate for Shoring Frame Scaffolding Base Plate for Shoring Frame Scaffolding Base Plate for Shoring Frame Scaffolding Base Plate for Shoring Frame Scaffolding Base Plate for Shoring Frame Scaffolding Base Plate for Shoring Frame Scaffolding


FAQ

1.---What is your product range?
   ---Ringlock system, frame system, tubes and couplers, cuplock system, props, other scaffolding accessories and metal products.

2.---What is MOQ?
   ---Usually we don't have a MOQ, but it depends on the product you are looking for.

3.---Can I request samples? Is it free?
   ---Yes, we can offer free samples on most itmes if it is not too heavy or big.

4.---Do you offer OEM service?
   ---Yes.

5.---How you do the quality control?
   ---Our strict quality control system ensures all products well made step by step. All the raw materials are bought from professional steel manufacturers, with Mill Test Certificates offered. Our quality control persons inspect and monitor the whole process from raw material, cutting, pressing, welding, matching, surface finish, finishing process, packing, container loading and transportation.

6.---Do you have certificate?
   ---Clients need to pay the cost to do the test from Third Party Testing Agent. Factory certificates can be offered for some products. We have testing machines in the factory, and also working with labs for testing.

7.---What is production time?
   ---Usually it takes 25-30 days for the first container, production goes faster after the first container once all raw materials are ready. The more the faster. Partial shipment can be arranged if requested.

8.---What is your payment term?
   ---T/T is prefered. L/C at sight can be accepted in some area.

9.---What is your after-sale service?
   ---All the after-sale problems will be solved based on mutual friendly communication.
       In case of quantity shortage, the detailed certificates should be sent to our side in seven days after the goods arrive at  your warehouse. In case of quality discrepancy, such as problems caused by raw material, welding, or surface finish, the detailed certificates should be sent to our side. If it is confirmed caused by our side for the above two mentioned situations, the loss will be compensated as the new goods sent to your side in next order.

Some information about us
Base Plate for Shoring Frame Scaffolding
Base Plate for Shoring Frame Scaffolding Base Plate for Shoring Frame Scaffolding Base Plate for Shoring Frame Scaffolding
 

Send your message to this supplier

*From:
*To:
avatar Miss Lina Xu
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now