Gold Member Since 2016
Audited Supplier
Nanjing Tuopeng Construction Technology Co., Ltd.

Mason Frame Scaffold, Frame Scaffolding, Ladder Frame Scaffolding manufacturer / supplier in China, offering Mason Frame Scaffold 5′x5′ Powder Coated, Galvanized Scaffolding Screw Jack with Painted Base Plate, Construction Support Adjustable Scaffolding Steel Shoring Prop and so on.

(/ )

Supplier Homepage Product Mason frame scaffolding Mason Frame Scaffold 5′x5′ Powder Coated

Mason Frame Scaffold 5′x5′ Powder Coated

FOB Price: US $22-35 / Piece
Min. Order: 300 Pieces
Min. Order FOB Price
300 Pieces US $22-35/ Piece
Get Latest Price
Port: Nanjing, China
Production Capacity: 2000tons Per Year
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Product Catalog
Frame scaffolding
32 Products
Content
Product Image
Product Name
FOB Price
Port
Payment Terms
Product Package
Product Attribute
Product Table
Basic Info
  • Model NO.: TPCTMF55001
  • Type: Fixed
  • Framework: Combined Scaffolding
  • Lapping Form: Full Scaffolding
  • Move Method: Attached Lifting Scaffolding
  • Construction Properties: Installation Scaffold
  • Unit Weight: 19kg
  • Trademark: Everprime Scaffold
  • Specification: 5ft x 5 ft
  • HS Code: 73084000
  • Material: Steel
  • Structural Style: Multi-Pole Scaffolding
  • Supporting Mode: Projecting Scaffolding
  • Erection Position: External Scaffolding
  • Scaffolding Part Type: Scaffolding Frames
  • Item: 5ft X 5ft Frame Scaffold
  • Surface Finish: Powder Coated,HDG
  • Transport Package: in Bags First, Then Pallet
  • Origin: Jiangsu, China
Product Description

Mason frame scaffold/Ladder frame scaffolding:
 
1.5'x5'mason scaffolding frame is made of 42.7×2.4mm tube and 25.4×1.65mm tube,welded with Canadian type lock and pin
2.Material:vertical,Q345;horizontal,Q235
3.Surface finish:powder coated,painted,or hot dip galvanized
4.Package:free steel pallet,or bulk packaging to save space and freight cost per piece
5.A full mason frame scaffoding set is composed of two frames,two cross braces,four levelling base jacks ,and four coupling pins(connectors)
6.Other sizes of frame scaffold are available:5'x3′,5'x4′,30″x60″,72″x60″,etc.

Different lock pins for option:

Mason Frame Scaffold 5'x5' Powder Coated

Mason Frame Scaffold 5'x5' Powder Coated
Mason Frame Scaffold 5'x5' Powder Coated
Mason Frame Scaffold 5'x5' Powder Coated
Mason Frame Scaffold 5'x5' Powder Coated
Mason Frame Scaffold 5'x5' Powder Coated

FAQ

1.---What is your product range?
   ---Ringlock system,frame system,tubes and couplers,cuplock system,props,other scaffolding accessories and metal products.

2.---What is MOQ?
   ---Usually we don't have a MOQ,but it depends on the product you are looking for

3.---Can I request samples?Is it free?
   ---Yes,we can offer free samples on most itmes if it is not too heavy or big

4.---Do you offer OEM service?
   ---Yes

5.---How you do the quality control?
   ---Our strict quality control system ensures all products well made step by step. All the raw materials are bought from professional steel manufacturers, with Mill Test Certificates offered. Our quality control persons inspect and monitor the whole process from raw material, cutting, pressing, welding, matching, surface finish, finishing process, packing, container loading and transportation.

6.---Do you have certificate?
   ---Clients need to pay the cost to do the test from Third Party Testing Agent.Factory certificates can be offered for some products.We have testing machines in the factory,and also working with labs for testing.

7.---What is production time?
   ---Usually it takes 25-30 days for the first container,production goes faster after the first container once all raw materials are ready.The more the faster.Partial shipment can be arranged if requested.

8.---What is your payment term?
   ---T/T is prefered.L/C at sight can be accepted in some area.

9.---What is your after-sale service?
   ---All the after-sale problems will be solved based on mutual friendly communication.
       In case of quantity shortage,the detailed certificates should be sent to our side in seven days after the goods arrive at  your warehouse.In case of quality discrepancy,such as problems caused by raw material,welding,or surface finish,the detailed certificates should be sent to our side.If it is confirmed caused by our side for the above two mentioned situations,the loss will be compensated as the new goods sent to your side in next order.




 
Send your message to this supplier
Avatar
Miss Lina Xu
Sales
*From:
To: Miss Lina Xu
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

Find Similar Products By Category