• Powder Coated Mason Frame Scaffold 5′x5′
  • Powder Coated Mason Frame Scaffold 5′x5′
  • Powder Coated Mason Frame Scaffold 5′x5′
  • Powder Coated Mason Frame Scaffold 5′x5′
  • Powder Coated Mason Frame Scaffold 5′x5′
  • Powder Coated Mason Frame Scaffold 5′x5′

Powder Coated Mason Frame Scaffold 5′x5′

Material: Steel
Type: Fixed
Structural Style: Multi-Pole Scaffolding
Framework: Combined Scaffolding
Supporting Mode: Projecting Scaffolding
Lapping Form: Full Scaffolding
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2016

Suppliers with verified business licenses

Trading Company

Basic Info.

Model NO.
TPCTMF55001
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Frames
Construction Properties
Installation Scaffold
Item
5FT X 5FT Frame Scaffold
Unit Weight
19kg
Surface Finish
Powder Coated, HDG
Transport Package
in Bundles
Specification
5ft x 5 ft
Trademark
Tuopeng Scaffold
Origin
Jiangsu, China
HS Code
73084000
Production Capacity
2000tons Per Year

Product Description


Mason frame scaffold/ Ladder frame scaffolding:
 

1. 5'x5'mason scaffolding frame is made of 42.7×2.4mm tube and 25.4×1.65mm tube, welded with Canadian type lock and pin
2. Material: vertical, Q345; horizontal, Q235
3. Surface finish: powder coated, painted, or hot dip galvanized
4. Package: free steel pallet, or bulk packaging to save space and freight cost per piece
5. A full mason frame scaffoding set is composed of two frames, two cross braces, four levelling base jacks , and four coupling pins(connectors)
6.Other sizes of frame scaffold are available:5'x3′,5'x4′,30″x60″,72″x60″,etc.

Different lock pins for option:


Powder Coated Mason Frame Scaffold 5′x5′

5' x 5' mason frame/ ladder frame

Powder Coated Mason Frame Scaffold 5′x5′

5' x 5' galvanized mason frame/ 60" x 60" galvanized mason frame

Powder Coated Mason Frame Scaffold 5′x5′
Galvanized cross brace, available in different lengths

Powder Coated Mason Frame Scaffold 5′x5′Powder Coated Mason Frame Scaffold 5′x5′
Galvanized coupling pins to connecting frames

Powder Coated Mason Frame Scaffold 5′x5′

Levelling jacks for frame scaffolding

Powder Coated Mason Frame Scaffold 5′x5′Powder Coated Mason Frame Scaffold 5′x5′

Scaffolding base plate


Powder Coated Mason Frame Scaffold 5′x5′
Scaffolding caster wheel 8"

Powder Coated Mason Frame Scaffold 5′x5′
Scaffolding pig tails


Powder Coated Mason Frame Scaffold 5′x5′
Scaffolding stairways

Powder Coated Mason Frame Scaffold 5′x5′

FAQ

1.---What is your product range?
   ---Ringlock system, frame system, tubes and couplers, cuplock system, props, other scaffolding accessories and metal products.

2.---What is MOQ?
   ---Usually we don't have a MOQ, but it depends on the product you are looking for

3.---Can I request samples?Is it free?
   ---Yes, we can offer free samples on most itmes if it is not too heavy or big

4.---Do you offer OEM service?
   ---Yes

5.---How you do the quality control?
   ---Our strict quality control system ensures all products well made step by step. All the raw materials are bought from professional steel manufacturers, with Mill Test Certificates offered. Our quality control persons inspect and monitor the whole process from raw material, cutting, pressing, welding, matching, surface finish, finishing process, packing, container loading and transportation.

6.---Do you have certificate?
   ---Clients need to pay the cost to do the test from Third Party Testing Agent. Factory certificates can be offered for some products. We have testing machines in the factory, and also working with labs for testing.

7.---What is production time?
   ---Usually it takes 25-30 days for the first container,production goes faster after the first container once all raw materials are ready. The more the faster. Partial shipment can be arranged if requested.

8.---What is your payment term?
   ---T/T is prefered. L/C at sight can be accepted in some area.

9.---What is your after-sale service?
   ---All the after-sale problems will be solved based on mutual friendly communication.
       In case of quantity shortage, the detailed certificates should be sent to our side in seven days after the goods arrive at  your warehouse. In case of quality discrepancy, such as problems caused by raw material, welding, or surface finish, the detailed certificates should be sent to our side. If it is confirmed caused by our side for the above two mentioned situations, the loss will be compensated as the new goods sent to your side in next order.




 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now