• Scaffolding Vertical for Cuplock System

Scaffolding Vertical for Cuplock System

Material: Steel
Type: Fixed or Mobile
Structural Style: Multi-Pole Scaffolding
Framework: Combined Scaffolding
Supporting Mode: Floor Type Scaffolding
Lapping Form: Full Scaffolding
Customization:

Contact Supplier

Diamond Member Since 2016

Suppliers with verified business licenses

Trading Company

Basic Info.

Model NO.
TPCTCSS008
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Cuplock Scaffolding
Construction Properties
Installation Scaffold
Item Name
Cuplock Scaffolding Standard
Surface Finish
HDG,Painted,Powder Coated
Length
0.5m,1m,1.5m,2m,3m,etc.
Marking Service
Available
Transport Package
Steel Pallet
Specification
48.3x3.2mm
Trademark
Everprime Scaffold
Origin
Jiangsu, China
HS Code
73084000
Production Capacity
2000tons Per Year

Product Description

Cuplock scaffolding Standard/Vertical
Cuplock scaffolding standard is made of 48.3mm tubes,with cup joints at every 500mm interval.The top cups are mobile,the bottom cups are welded.The work perfectly with ledger blade to lock the scaffolding safely.
Surface finish:hot dip galvanised long lasting from rusted,powder coated or painted protecting the surface with less cost
Packing: steel pallet
Various sizes are available:
Item CodeLengthWeight(kg)
TPCTCSS0500.5 M3.53
TPCTCSS1001 M6.31
TPCTCSS1301.3M8.28
TPCTCSS1501.5 M9.05
TPCTCSS1801.8 M11.05
TPCTCSS2002 M11.82
TPCTCSS2302.3 M13.80
TPCTCSS2502.5 M14.57
TPCTCSS2802.8 M16.58
TPCTCSS3003 M17.34

FAQ

1.---What is your product range?
   ---Ringlock system,frame system,tubes and couplers,cuplock system,props,other scaffolding accessories and metal products.

2.---What is MOQ?
   ---Usually we don't have a MOQ,but it depends on the product you are looking for

3.---Can I request samples?Is it free?
   ---Yes,we can offer free samples on most itmes if it is not too heavy or big

4.---Do you offer OEM service?
   ---Yes

5.---How you do the quality control?
   ---Our strict quality control system ensures all products well made step by step. All the raw materials are bought from professional steel manufacturers, with Mill Test Certificates offered. Our quality control persons inspect and monitor the whole process from raw material, cutting, pressing, welding, matching, surface finish, finishing process, packing, container loading and transportation.

6.---Do you have certificate?
   ---Clients need to pay the cost to do the test from Third Party Testing Agent.Factory certificates can be offered for some products.We have testing machines in the factory,and also working with labs for testing.

7.---What is production time?
   ---Usually it takes 25-30 days for the first container,production goes faster after the first container once all raw materials are ready.The more the faster.Partial shipment can be arranged if requested.

8.---What is your payment term?
   ---T/T is prefered.L/C at sight can be accepted in some area.

9.---What is your after-sale service?
   ---All the after-sale problems will be solved based on mutual friendly communication.
       In case of quantity shortage,the detailed certificates should be sent to our side in seven days after the goods arrive at  your warehouse.In case of quality discrepancy,such as problems caused by raw material,welding,or surface finish,the detailed certificates should be sent to our side.If it is confirmed caused by our side for the above two mentioned situations,the loss will be compensated as the new goods sent to your side in next order.
 

Send your message to this supplier

*From:
*To:
avatar Miss Lina Xu
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now