Gold Member Since 2016
Audited Supplier
Nanjing Tuopeng Construction Technology Co., Ltd.

Scaffold, Scaffolding Coupler, Scaffolding Clamp manufacturer / supplier in China, offering Drop Forged Double Coupler for Tube and Coupler Scaffold, Galvanized Scaffolding Screw Jack with Painted Base Plate, Construction Support Adjustable Scaffolding Steel Shoring Prop and so on.

(/ )

Supplier Homepage Product Scaffolding clamps Drop Forged Double Coupler for Tube and Coupler Scaffold

Drop Forged Double Coupler for Tube and Coupler Scaffold

FOB Price: US $1.25-1.4 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $1.25-1.4/ Piece
Get Latest Price
Port: Nanjing, China
Production Capacity: 2000tons Per Year
Payment Terms: L/C, T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: TPCTDFDCBT001
  • Type: Fixed
  • Framework: Combined Scaffolding
  • Lapping Form: Full Scaffolding
  • Move Method: Attached Lifting Scaffolding
  • Construction Properties: Installation Scaffold
  • Unit Weight: 0.97kg
  • Trademark: Everprime Scaffold
  • Specification: 48.3mm*48.3mm
  • HS Code: 73084000
  • Material: Steel
  • Structural Style: Multi-Pole Scaffolding
  • Supporting Mode: Projecting Scaffolding
  • Erection Position: External Scaffolding
  • Scaffolding Part Type: Scaffolding Couplers
  • Item: Drop Forged Double Coupler
  • Surface Finish: HDG, Electro Galvanized
  • Transport Package: in Bags First, Then Pallet
  • Origin: Jiangsu, China
Product Description
Scaffolding Drop forged double coupler British type:

1.Drop forged double coupler British type,which is widely used in global market to connect 48.3mm tubes at 90 degrees.
2.Unit weight: 0.97kg
3.Surface finish: electro galvanized,or hot dip galvanized
4.Meeting EN74 and BS1139 Standard
5.Packing: 25pcs in one bag,50 bags are packed on one wood or steel pallet
6.Rich experience in producing all types of couplers,pressed type and drop forged type.We have our own forging line
7.Fast delivery

If you did not find the right coupler from the following list,please email us
 
No.ItemWeight (kg)
1Drop forged fixed coupler British type:48.3x48.30.97
2Drop forged swivel coupler British type:48.3x48.31.15
3Drop forged putlog coupler0.65
4Pressed sleeve,end to end connector1.02
5Drop forged fixed girder coupler1.5
6Drop forged swivel girder coupler1.6
7Ladder coupler0.72
8Drop forged inner joint pin1.1
9Board retaining coupler0.63
10Pressed right angle coupler British type0.85
11Pressed swivel coupler British type1.02
12Pressed putlog coupler0.63
13Pressed inner joint pin0.68
14Drop forged fixed coupler American type:48.3x48.31.65
15Drop forged swivel coupler American type:48.3x48.31.75
16Drop forged half coupler British type0.65
17Drop forged half coupler American type0.92
18Drop forged fixed coupler German type:48.3x48.31.05
19Drop forged swivel coupler German type:48.3x48.31.25

Drop Forged Double Coupler for Tube and Coupler ScaffoldDrop Forged Double Coupler for Tube and Coupler Scaffold
Drop Forged Double Coupler for Tube and Coupler Scaffold
Drop Forged Double Coupler for Tube and Coupler Scaffold
Drop Forged Double Coupler for Tube and Coupler Scaffold

FAQ

1.---What is your product range?
   ---Ringlock system,frame system,tubes and couplers,cuplock system,props,other scaffolding accessories and metal products.

2.---What is MOQ?
   ---Usually we don't have a MOQ,but it depends on the product you are looking for

3.---Can I request samples?Is it free?
   ---Yes,we can offer free samples on most itmes if it is not too heavy or big

4.---Do you offer OEM service?
   ---Yes

5.---How you do the quality control?
   ---Our strict quality control system ensures all products well made step by step. All the raw materials are bought from professional steel manufacturers, with Mill Test Certificates offered. Our quality control persons inspect and monitor the whole process from raw material, cutting, pressing, welding, matching, surface finish, finishing process, packing, container loading and transportation.

6.---Do you have certificate?
   ---Clients need to pay the cost to do the test from Third Party Testing Agent.Factory certificates can be offered for some products.We have testing machines in the factory,and also working with labs for testing.

7.---What is production time?
   ---Usually it takes 25-30 days for the first container,production goes faster after the first container once all raw materials are ready.The more the faster.Partial shipment can be arranged if requested.

8.---What is your payment term?
   ---T/T is prefered.L/C at sight can be accepted in some area.

9.---What is your after-sale service?
   ---All the after-sale problems will be solved based on mutual friendly communication.
       In case of quantity shortage,the detailed certificates should be sent to our side in seven days after the goods arrive at  your warehouse.In case of quality discrepancy,such as problems caused by raw material,welding,or surface finish,the detailed certificates should be sent to our side.If it is confirmed caused by our side for the above two mentioned situations,the loss will be compensated as the new goods sent to your side in next order.

 
Send your message to this supplier
Avatar
Miss Lina Xu
Sales
*From:
To: Miss Lina Xu
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now