Steel Scaffolding Ladder Beam in Various Lengths

Product Details
Customization: Available
Material: Steel
Type: Fixed
Diamond Member Since 2016

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
4
Year of Establishment
2016-04-26
  • Steel Scaffolding Ladder Beam in Various Lengths
Find Similar Products

Basic Info.

Model NO.
TPCTSLB002
Structural Style
Tower Scaffolding
Framework
Combined Scaffolding
Supporting Mode
Projecting Scaffolding
Lapping Form
Full Scaffolding
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Couplers
Construction Properties
Installation Scaffold
Item Name
Scaffolding Ladder Beam
Length
Various
Material Type
Q235
Surface Finish
HDG
Transport Package
in Bundles
Specification
48.3x3.2mm
Trademark
Everprime Scaffold
Origin
Jiangsu, China
HS Code
73084000
Production Capacity
600000PCS/Year

Product Description


Scaffolding ladder beam
     
1.Scaffolding ladder beam is made of 48.3x3.2mm steel tubes
2.Material type: Q235 or Q345
3.The width is 300mm,it can also be produced as required
4.Different lengths are available
5.Packing: pallet
6.Rich production experience
7.High quality and fast delivery
8.Customized requirements can be met


FAQ about TP Scaffold

1.---What is your product range?
   ---Ringlock system,frame system,tubes and couplers,cuplock system,props,other scaffolding accessories and metal products.

2.---What is MOQ?
   ---Usually we don't have a MOQ,but it depends on the product you are looking for

3.---Can I request samples?Is it free?
   ---Yes,we can offer free samples on most itmes if it is not too heavy or big

4.---Do you offer OEM service?
   ---Yes

5.---How you do the quality control?
   ---Our strict quality control system ensures all products well made step by step. All the raw materials are bought from professional steel manufacturers, with Mill Test Certificates offered. Our quality control persons inspect and monitor the whole process from raw material, cutting, pressing, welding, matching, surface finish, finishing process, packing, container loading and transportation.

6.---Do you have certificate?
   ---Clients need to pay the cost to do the test from Third Party Testing Agent.Factory certificates can be offered for some products.We have testing machines in the factory,and also working with labs for testing.

7.---What is production time?
   ---Usually it takes 25-30 days for the first container,production goes faster after the first container once all raw materials are ready.The more the faster.Partial shipment can be arranged if requested.

8.---What is your payment term?
   ---T/T is prefered.L/C at sight can be accepted in some area.

9.---What is your after-sale service?
   ---All the after-sale problems will be solved based on mutual friendly communication.
       In case of quantity shortage,the detailed certificates should be sent to our side in seven days after the goods arrive at  your warehouse.In case of quality discrepancy,such as problems caused by raw material,welding,or surface finish,the detailed certificates should be sent to our side.If it is confirmed caused by our side for the above two mentioned situations,the loss will be compensated as the new goods sent to your side in next order.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier
People who viewed this also viewed