Scaffolding Prop Accessories Prop Nut

Product Details
Customization: Available
Material: Steel
Type: Fixed
Diamond Member Since 2016

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
4
Year of Establishment
2016-04-26
  • Scaffolding Prop Accessories Prop Nut
Find Similar Products

Basic Info.

Model NO.
TPCTSPN001
Structural Style
Multi-Pole Scaffolding
Framework
Combined Scaffolding
Supporting Mode
Projecting Scaffolding
Lapping Form
Full Scaffolding
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Props
Construction Properties
Building Scaffold
Item
Scaffolding Prop Nut
Surface Finish
Electro Gal. ,Self Color
Material Type
Q235
Weight
0.8-0.97kg
Transport Package
Steel Pallet
Specification
As per required
Trademark
TP Scaffold
Origin
Jiangsu, China
HS Code
73084000
Production Capacity
200tons Per Month

Product Description


Scaffolding prop nut in casting material / forged material

1.Prop nut  is made of casting or forging material.
2.Weight:0.8kg-0.96kg
3.Scaffolding props of various sizes are supplied here.The tube diameter and thickness can be produced as required.You can choose light duty type,medium duty type or heavy duty type for your construction needs.
4..Different nuts,plates for choice
5.Surface finish:painted,galvanized,etc.
6.Packing:steel pallet or in bundles
7.High strength,long durability,safe loading capacity
8.The props can be adjusted to a desired length
9.Competitive price and fast delivery
10.Customized needs can be fulfilled.
11.All related accessories for steel prop are supplied here.
 
Type Scaffolding Prop nut
Material Q235 Material is as per customer's demand with high tensile and yield stress
Color self color,silver,or as requested
Surface Treatment self color,elctro galvanized,etc.
Advantages Top quality, Competitive price, Timely delivery, Good Service, Standard package,
Minimum order 1 piece
Supply ability 20 containers/month
Port Tianjin
Currency USD,RMB
Payment L/C, T/T, 30% in advance
Package Bags and Pallet
Delivery according to quantities to be needed

FAQ

1.---What is your product range?
   ---Ringlock system,frame system,tubes and couplers,cuplock system,props,other scaffolding accessories and metal products.

2.---What is MOQ?
   ---Usually we don't have a MOQ,but it depends on the product you are looking for

3.---Can I request samples?Is it free?
   ---Yes,we can offer free samples on most itmes if it is not too heavy or big

4.---Do you offer OEM service?
   ---Yes

5.---How you do the quality control?
   ---Our strict quality control system ensures all products well made step by step. All the raw materials are bought from professional steel manufacturers, with Mill Test Certificates offered. Our quality control persons inspect and monitor the whole process from raw material, cutting, pressing, welding, matching, surface finish, finishing process, packing, container loading and transportation.

6.---Do you have certificate?
   ---Clients need to pay the cost to do the test from Third Party Testing Agent.Factory certificates can be offered for some products.We have testing machines in the factory,and also working with labs for testing.

7.---What is production time?
   ---Usually it takes 25-30 days for the first container,production goes faster after the first container once all raw materials are ready.The more the faster.Partial shipment can be arranged if requested.

8.---What is your payment term?
   ---T/T is prefered.L/C at sight can be accepted in some area.

9.---What is your after-sale service?
   ---All the after-sale problems will be solved based on mutual friendly communication.
       In case of quantity shortage,the detailed certificates should be sent to our side in seven days after the goods arrive at  your warehouse.In case of quality discrepancy,such as problems caused by raw material,welding,or surface finish,the detailed certificates should be sent to our side.If it is confirmed caused by our side for the above two mentioned situations,the loss will be compensated as the new goods sent to your side in next order.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier
People who viewed this also viewed