• Scaffolding Frame Shoring Style for Construction
  • Scaffolding Frame Shoring Style for Construction
  • Scaffolding Frame Shoring Style for Construction
  • Scaffolding Frame Shoring Style for Construction
  • Scaffolding Frame Shoring Style for Construction
  • Scaffolding Frame Shoring Style for Construction

Scaffolding Frame Shoring Style for Construction

Material: Steel
Type: Fixed
Structural Style: Multi-Pole Scaffolding
Framework: Frame Combined Scaffolding
Supporting Mode: Projecting Scaffolding
Lapping Form: Full Scaffolding
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:

Contact Supplier

Diamond Member Since 2016

Suppliers with verified business licenses

Trading Company

Basic Info.

Model NO.
TPCTSFS010
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Frames
Construction Properties
Installation Scaffold
Item Name
Shoring Frame Scaffolding
Surface Finish
HDG,Powder Coated
Color
Silver,Yellow,Pink,Blue,etc.
Vertical Tube
Q345
Transport Package
Bulk Packaging, or Steel Pallet
Specification
6′x4′, 5′x4′, 4′x4′, etc.
Trademark
Everprime Scaffold
Origin
Jiangsu, China
HS Code
73084000
Production Capacity
2000tons Per Year

Product Description

Shoring frame scaffolding:
 
1. Heavy duty shoring frame scaffolding is made of 63.8×3.2mm tubes Q345 material for verticals, and 42.7×2.4mm tubes for horizontals.(Customized dimensions can be produced)
2. Various lengths and widths are available,such as: 5' x 4′, 6' x 4′,7'6″ x 4′, etc.
3. Different frame locks, such as Candian type lock, fast locks, etc. can be welded as required
4. Surface finish: powder coated, hot dip galvanized
5. Package: standing in the container to save space, or steel pallet as required
6. Rich production experience
7. Competitive price
8. Fast delivery
9. Other related shoring scaffolding accessories are also available with high quality and fast delivery: galvanized cross brace, screw jack, J head and base plate (interior type and exterior type)
 

Type

Shoring Frame scaffolding

Material

Q235 and Q345 material with high tensile and yield stress

Color

silver, yellow, red, or as requested

Surface Treatment

Powder coated, HDG, etc.

Advantages

Top quality, Competitive price, Timely delivery, Good Service, Standard package,

Minimum order

1 piece

Supply ability

20 containers/ month

Port

Nanjing/ Shanghai

Currency

USD,RMB

Payment

L/C, T/T, 30% in advance

Package

Bags and Pallet

Delivery

according to quantities to be needed

5' x 4' scaffolding shoring frame

Scaffolding Frame Shoring Style for Construction Scaffolding Frame Shoring Style for Construction
6' x 4' scaffolding shoring frame

Scaffolding Frame Shoring Style for Construction Scaffolding Frame Shoring Style for Construction Scaffolding Frame Shoring Style for Construction
7'6" x 4' scaffolding shoring frames

Scaffolding Frame Shoring Style for Construction Scaffolding Frame Shoring Style for Construction Scaffolding Frame Shoring Style for Construction Scaffolding Frame Shoring Style for Construction
Other scaffolding shoring accessories

Cross brace

Scaffolding Frame Shoring Style for Construction

J head

Scaffolding Frame Shoring Style for Construction

Screw jack

Scaffolding Frame Shoring Style for Construction

FAQ

1.---What is your product range?
   ---Ringlock system,frame system,tubes and couplers,cuplock system,props,other scaffolding accessories and metal products.

2.---What is MOQ?
   ---Usually we don't have a MOQ,but it depends on the product you are looking for

3.---Can I request samples?Is it free?
   ---Yes,we can offer free samples on most itmes if it is not too heavy or big

4.---Do you offer OEM service?
   ---Yes

5.---How you do the quality control?
   ---Our strict quality control system ensures all products well made step by step. All the raw materials are bought from professional steel manufacturers, with Mill Test Certificates offered. Our quality control persons inspect and monitor the whole process from raw material, cutting, pressing, welding, matching, surface finish, finishing process, packing, container loading and transportation.

6.---Do you have certificate?
   ---Clients need to pay the cost to do the test from Third Party Testing Agent.Factory certificates can be offered for some products.We have testing machines in the factory,and also working with labs for testing.

7.---What is production time?
   ---Usually it takes 25-30 days for the first container,production goes faster after the first container once all raw materials are ready.The more the faster.Partial shipment can be arranged if requested.

8.---What is your payment term?
   ---T/T is prefered.L/C at sight can be accepted in some area.

9.---What is your after-sale service?
   ---All the after-sale problems will be solved based on mutual friendly communication.
       In case of quantity shortage,the detailed certificates should be sent to our side in seven days after the goods arrive at  your warehouse.In case of quality discrepancy,such as problems caused by raw material,welding,or surface finish,the detailed certificates should be sent to our side.If it is confirmed caused by our side for the above two mentioned situations,the loss will be compensated as the new goods sent to your side in next order.













 

Send your message to this supplier

*From:
*To:
avatar Miss Lina Xu
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now